{"id":31149,"date":"2026-07-24T07:34:44","date_gmt":"2026-07-23T23:34:44","guid":{"rendered":"https:\/\/shchimay.com\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/"},"modified":"2026-07-24T07:34:44","modified_gmt":"2026-07-23T23:34:44","slug":"why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay","status":"publish","type":"post","link":"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/","title":{"rendered":"Why Data Center Operators Now Treat Cooling Water Quality as a Reliability KPI: Analysis by Shanghai ChiMay"},"content":{"rendered":"<hr \/>\n<p>title: &ldquo;Why Data Center Operators Now Treat Cooling Water Quality as a Reliability KPI: Analysis by Shanghai ChiMay&rdquo;<br \/>\nperspective: C-Level \/ Decision Maker<br \/>\ntheme: HVAC &amp; Data Center Cooling Water<br \/>\ndate: 2026-07-04<\/p>\n<hr \/>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_50 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#Why_Data_Center_Operators_Now_Treat_Cooling_Water_Quality_as_a_Reliability_KPI_Analysis_by_Shanghai_ChiMay\" title=\"Why Data Center Operators Now Treat Cooling Water Quality as a Reliability KPI: Analysis by Shanghai ChiMay\">Why Data Center Operators Now Treat Cooling Water Quality as a Reliability KPI: Analysis by Shanghai ChiMay<\/a><ul class='ez-toc-list-level-2'><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#Key_Takeaways\" title=\"Key Takeaways\">Key Takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#The_Shift_in_One_Sentence\" title=\"The Shift in One Sentence\">The Shift in One Sentence<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#Why_the_C-Suite_Cares_Now\" title=\"Why the C-Suite Cares Now\">Why the C-Suite Cares Now<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#1_AI_Workload_Sensitivity\" title=\"1. AI Workload Sensitivity\">1. AI Workload Sensitivity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#2_Water_Usage_Effectiveness_WUE_Reporting\" title=\"2. Water Usage Effectiveness (WUE) Reporting\">2. Water Usage Effectiveness (WUE) Reporting<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#3_Insurance_and_Regulatory_Exposure\" title=\"3. Insurance and Regulatory Exposure\">3. Insurance and Regulatory Exposure<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#4_Capex_Efficiency\" title=\"4. Capex Efficiency\">4. Capex Efficiency<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#The_Emerging_KPI_Stack\" title=\"The Emerging KPI Stack\">The Emerging KPI Stack<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#Comparative_Snapshot_Traditional_vs_Modern_Water_KPI_Framework\" title=\"Comparative Snapshot: Traditional vs. Modern Water KPI Framework\">Comparative Snapshot: Traditional vs. Modern Water KPI Framework<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#What_the_Executive_Conversation_Sounds_Like_Now\" title=\"What the Executive Conversation Sounds Like Now\">What the Executive Conversation Sounds Like Now<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#Portfolio-Scale_Payback\" title=\"Portfolio-Scale Payback\">Portfolio-Scale Payback<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#Where_Shanghai_ChiMay_Fits\" title=\"Where Shanghai ChiMay Fits\">Where Shanghai ChiMay Fits<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#A_Decision_Framework_for_Executives\" title=\"A Decision Framework for Executives\">A Decision Framework for Executives<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/shchimay.com\/es\/why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\/#Outlook\" title=\"Outlook\">Outlook<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h1 id=\"why-data-center-operators-now-treat-cooling-water-quality-as-a-reliability-kpi-analysis-by-shanghai-chimay\"><span class=\"ez-toc-section\" id=\"Why_Data_Center_Operators_Now_Treat_Cooling_Water_Quality_as_a_Reliability_KPI_Analysis_by_Shanghai_ChiMay\"><\/span>Why Data Center Operators Now Treat Cooling Water Quality as a Reliability KPI: Analysis by Shanghai ChiMay<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<h2 id=\"key-takeaways\"><span class=\"ez-toc-section\" id=\"Key_Takeaways\"><\/span>Key Takeaways<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>Cooling water quality has moved out of the facilities engineering silo and into the executive reliability dashboard, joining PUE, WUE, and unplanned-outage minutes as a first-class KPI.<\/li>\n<li>The driver is math: a single scale-driven chiller trip in a high-density AI training campus can translate to <strong>USD 500,000 to USD 2 million<\/strong> in lost customer SLA credits and clean-up cost within one shift.<\/li>\n<li>The dashboarded metrics converging across hyperscale and colocation portfolios are conductivity (cycles-of-concentration), pH, free chlorine, and softener\/make-up flow \u2014 all continuously measured.<\/li>\n<li>Shanghai ChiMay&rsquo;s <a href=\"\/tag\/water-quality-analyzer\" target=\"_blank\"><strong>water quality analyzer<\/strong><\/a> and <a href=\"\/tag\/control-valve\/\" target=\"_blank\"><strong>control valve<\/strong><\/a> portfolio is engineered around continuous, BMS-integrated instrumentation that maps cleanly to this new reliability-KPI reality.<\/li>\n<\/ul>\n<h2 id=\"the-shift-in-one-sentence\"><span class=\"ez-toc-section\" id=\"The_Shift_in_One_Sentence\"><\/span>The Shift in One Sentence<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For most of the last twenty years, cooling water was managed by the facilities team, reviewed monthly, and reported quarterly. Between 2022 and 2026, three forces broke that model: rack densities crossed 40 kW, AI training workloads made cooling demand highly transient, and hyperscale customers began writing water KPIs directly into their colocation MSAs. Cooling water quality is now something a CFO can be asked about.<\/p>\n<h2 id=\"why-the-c-suite-cares-now\"><span class=\"ez-toc-section\" id=\"Why_the_C-Suite_Cares_Now\"><\/span>Why the C-Suite Cares Now<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"1-ai-workload-sensitivity\"><span class=\"ez-toc-section\" id=\"1_AI_Workload_Sensitivity\"><\/span>1. AI Workload Sensitivity<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Modern AI clusters draw power in sharp, sustained bursts. A 30 MW training run initiated at 08:00 is a step-change in heat rejection that a marginally scaled cooling plant will not absorb gracefully. In a plant with scale-fouled tubes, the approach temperature climbs, chiller efficiency drops, and hot spots appear in the whitespace. The customer sees latency; the operator sees SLA exposure.<\/p>\n<p>The chain from water chemistry to customer experience is now short and legible enough that boards understand it.<\/p>\n<h3 id=\"2-water-usage-effectiveness-wue-reporting\"><span class=\"ez-toc-section\" id=\"2_Water_Usage_Effectiveness_WUE_Reporting\"><\/span>2. Water Usage Effectiveness (WUE) Reporting<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>WUE \u2014 liters of water consumed per kilowatt-hour delivered \u2014 is a public and increasingly regulated metric. Hyperscale operators publish annual WUE figures and are expected to trend them downward. The biggest single lever on WUE is cycles of concentration in the cooling tower, and CoC is controlled through continuous conductivity monitoring. Water quality is now a sustainability metric, not just a maintenance metric.<\/p>\n<h3 id=\"3-insurance-and-regulatory-exposure\"><span class=\"ez-toc-section\" id=\"3_Insurance_and_Regulatory_Exposure\"><\/span>3. Insurance and Regulatory Exposure<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Property insurers now underwrite data-center policies with specific questions about water-management plans, chiller condition, and cooling-tower Legionella controls. ASHRAE 188 compliance is a routine checkbox in colocation due diligence. Failing that checkbox during renewal materially affects premium rates. This has pulled the CFO&rsquo;s office into the water-quality conversation.<\/p>\n<h3 id=\"4-capex-efficiency\"><span class=\"ez-toc-section\" id=\"4_Capex_Efficiency\"><\/span>4. Capex Efficiency<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Data-center capex is dominated by mechanical and electrical infrastructure. Every ton of chiller capacity that must be added because existing chillers cannot run at full efficiency due to fouling is capex that could have been avoided. Executives increasingly treat cooling-water instrumentation as a <strong>capex-avoidance investment<\/strong> rather than an opex line item.<\/p>\n<h2 id=\"the-emerging-kpi-stack\"><span class=\"ez-toc-section\" id=\"The_Emerging_KPI_Stack\"><\/span>The Emerging KPI Stack<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Across leading hyperscale and colocation operators, four water-quality KPIs are converging into standard reliability dashboards:<\/p>\n<table>\n<thead>\n<tr>\n<th>KPI<\/th>\n<th>Typical Target<\/th>\n<th>Instrument<\/th>\n<th>Why It Sits in the Dashboard<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Recirculation conductivity<\/td>\n<td>Within \u00b15% of setpoint<\/td>\n<td>In-line <a href=\"\/tag\/Conductivity-Meter\" target=\"_blank\"><strong><a href=\"\/tag\/conductivity-meter\/\" target=\"_blank\"><strong>conductivity meter<\/strong><\/a><\/strong><\/a><\/td>\n<td>Direct proxy for CoC and scale risk<\/td>\n<\/tr>\n<tr>\n<td>Chilled-water pH<\/td>\n<td>8.5\u20139.5<\/td>\n<td>In-line pH Electrode<\/td>\n<td>Copper corrosion protection<\/td>\n<\/tr>\n<tr>\n<td>Free chlorine (cooling tower)<\/td>\n<td>0.5\u20132.0 ppm<\/td>\n<td>Residual Chlorine Transmitter<\/td>\n<td>Legionella \/ biofilm control<\/td>\n<\/tr>\n<tr>\n<td>Make-up flow deviation<\/td>\n<td>&lt; 10% from baseline<\/td>\n<td>Turbine <a href=\"\/tag\/flow-meter\/\" target=\"_blank\"><strong>flow meter<\/strong><\/a><\/td>\n<td>Detects leaks, drift, and softener anomalies<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These four metrics are increasingly reported alongside PUE and WUE in monthly executive reviews. Some operators go further and include cycles-of-concentration and softener-regeneration-per-day as sub-KPIs.<\/p>\n<h2 id=\"comparative-snapshot-traditional-vs-modern-water-kpi-framework\"><span class=\"ez-toc-section\" id=\"Comparative_Snapshot_Traditional_vs_Modern_Water_KPI_Framework\"><\/span>Comparative Snapshot: Traditional vs. Modern Water KPI Framework<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<thead>\n<tr>\n<th>Attribute<\/th>\n<th>Traditional Model (Pre-2022)<\/th>\n<th>Modern Reliability-KPI Model<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Reporting cadence<\/td>\n<td>Monthly \/ quarterly<\/td>\n<td>Continuous with alarms<\/td>\n<\/tr>\n<tr>\n<td>Ownership<\/td>\n<td>Facilities engineering<\/td>\n<td>Facilities + Reliability + Sustainability<\/td>\n<\/tr>\n<tr>\n<td>Visibility<\/td>\n<td>Building-level<\/td>\n<td>Portfolio-level dashboard<\/td>\n<\/tr>\n<tr>\n<td>Data granularity<\/td>\n<td>Grab samples<\/td>\n<td>1-second telemetry<\/td>\n<\/tr>\n<tr>\n<td>Financial framing<\/td>\n<td>OPEX<\/td>\n<td>OPEX + capex avoidance + SLA protection<\/td>\n<\/tr>\n<tr>\n<td>Regulatory framing<\/td>\n<td>Basic compliance<\/td>\n<td>ASHRAE 188 + WUE public disclosure<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"what-the-executive-conversation-sounds-like-now\"><span class=\"ez-toc-section\" id=\"What_the_Executive_Conversation_Sounds_Like_Now\"><\/span>What the Executive Conversation Sounds Like Now<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Ten years ago, a CFO asked about cooling water might have said, &ldquo;That&rsquo;s a facilities issue.&rdquo; Today, the same conversation includes phrases like:<\/p>\n<ul>\n<li>&ldquo;What is the trailing-30-day CoC across the portfolio, and what does another 0.5 CoC translate into for WUE?&rdquo;<\/li>\n<li>&ldquo;How many make-up flow anomalies exceeded the alarm threshold last quarter, and how many of them were traced to root cause?&rdquo;<\/li>\n<li>&ldquo;Which sites are running outside the free chlorine window, and what is our insurance exposure if a Legionella positive is reported?&rdquo;<\/li>\n<\/ul>\n<p>These are answerable questions only if the underlying instrumentation is continuous and if the data is logged into the same reliability dashboard as PUE and WUE. Continuous sensor coverage is now the foundation of the conversation, not an optional upgrade.<\/p>\n<h2 id=\"portfolio-scale-payback\"><span class=\"ez-toc-section\" id=\"Portfolio-Scale_Payback\"><\/span>Portfolio-Scale Payback<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A large colocation operator ran a portfolio-wide audit in 2025 across 18 campuses and compared the sites that had adopted continuous water-quality monitoring against those that had not. The results:<\/p>\n<ul>\n<li>Unplanned chiller trips per campus per year: <strong>1.1 (monitored) vs. 3.4 (unmonitored)<\/strong>.<\/li>\n<li>Average CoC: <strong>5.8 (monitored) vs. 3.9 (unmonitored)<\/strong>.<\/li>\n<li>Annual make-up water per MW of IT load: <strong>8% lower in monitored sites<\/strong>.<\/li>\n<li>Estimated SLA credit exposure avoided across the monitored portfolio: <strong>USD 6.4 million per year<\/strong>.<\/li>\n<\/ul>\n<p>The financial case for treating water quality as a reliability KPI is no longer speculative.<\/p>\n<h2 id=\"where-shanghai-chimay-fits\"><span class=\"ez-toc-section\" id=\"Where_Shanghai_ChiMay_Fits\"><\/span>Where Shanghai ChiMay Fits<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Shanghai ChiMay designs its <a href=\"\/tag\/water-quality-analyzer\" target=\"_blank\"><strong>water quality analyzer<\/strong><\/a> family \u2014 in-line conductivity\/pH meters and electrodes, DO transmitters, residual chlorine transmitters, turbidity testers, 4-in-1 multi-parameter sensors, paddle wheel and turbine flow meters \u2014 around a shared controller and communications architecture. For a data-center portfolio, that translates directly into:<\/p>\n<ul>\n<li>A consistent KPI stack across all campuses regardless of build era.<\/li>\n<li>Fewer vendors to manage, fewer spare-parts pools to fund.<\/li>\n<li>Modbus RTU and HART integration that fits into standard BMS and DCIM platforms without custom middleware.<\/li>\n<li><a href=\"\/tag\/control-valve\/\" target=\"_blank\"><strong>control valve<\/strong><\/a> pairing \u2014 <a href=\"\/tag\/softener-valve\" target=\"_blank\"><strong>softener valve<\/strong><\/a> and Softening and filtering valve \u2014 that closes the loop on make-up water chemistry rather than treating it as a separate procurement track.<\/li>\n<\/ul>\n<h2 id=\"a-decision-framework-for-executives\"><span class=\"ez-toc-section\" id=\"A_Decision_Framework_for_Executives\"><\/span>A Decision Framework for Executives<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li>Are cooling-water KPIs on the same dashboard as PUE and WUE? If not, they should be.<\/li>\n<li>Are conductivity, pH, free chlorine, and make-up flow measured continuously at every campus?<\/li>\n<li>Is the sensor family standardized, or does each site run a different vendor stack?<\/li>\n<li>Is water-quality data available at the portfolio level for benchmarking?<\/li>\n<li>Are SLA and insurance exposures modeled against water-quality excursions, not just power and cooling capacity?<\/li>\n<\/ol>\n<p>If any of those answers is &ldquo;no,&rdquo; the operator is running with a blind spot that the current AI-driven load profile no longer forgives.<\/p>\n<h2 id=\"outlook\"><span class=\"ez-toc-section\" id=\"Outlook\"><\/span>Outlook<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Cooling water quality has arrived at the executive level in data-center operations, and it is not going back. The forces pulling it there \u2014 AI load transients, WUE reporting, insurance underwriting, and capex efficiency \u2014 are structural rather than cyclical. The operators moving fastest are those standardizing on continuous, integrated water-quality instrumentation as a portfolio-scale reliability investment. Shanghai ChiMay&rsquo;s <a href=\"\/tag\/water-quality-analyzer\" target=\"_blank\"><strong>water quality analyzer<\/strong><\/a> and <a href=\"\/tag\/control-valve\/\" target=\"_blank\"><strong>control valve<\/strong><\/a> portfolio is engineered to be exactly that: a matched, BMS-ready foundation for the KPI stack that data-center reliability now demands.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>title: &ldquo;Why Data Center Operators Now Treat Cooling Water Quality as a Reliability KPI: Analysis by Shanghai ChiMay&rdquo; perspective: C-Level \/ Decision Maker theme: HVAC &amp; Data Center Cooling Water date: 2026-07-04 Why Data Center Operators Now Treat Cooling Water Quality as a Reliability KPI: Analysis by Shanghai ChiMay Key Takeaways Cooling water quality has&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false},"categories":[1],"tags":[158,141,134429,207,174,147,134481,154],"translation":{"provider":"WPGlobus","version":"2.12.0","language":"es","enabled_languages":["en","es","fr","ru","ar"],"languages":{"en":{"title":true,"content":true,"excerpt":false},"es":{"title":false,"content":false,"excerpt":false},"fr":{"title":false,"content":false,"excerpt":false},"ru":{"title":false,"content":false,"excerpt":false},"ar":{"title":false,"content":false,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/posts\/31149"}],"collection":[{"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/comments?post=31149"}],"version-history":[{"count":0,"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/posts\/31149\/revisions"}],"wp:attachment":[{"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/media?parent=31149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/categories?post=31149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shchimay.com\/es\/wp-json\/wp\/v2\/tags?post=31149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}